WESTLAND HIALEAH SENIOR HIGH SCHOOL

PM: CARLOS HERRERA ISM#: 1766702 4000 W 18th Ave, Hialeah, FL 33012
Crew: 2 techs 40 hrs/tech 80 man-hrs 5 días est.

This project consists of furnishing and installing a complete CAT6 structured cabling system across three floors. The scope includes horizontal cabling, patching infrastructure inside independent IDFs per floor, routing cables through contractor-provided wiremolds/boxes, repairing existing floor drops, and establishing a 4-inch pathway transition. Total New Drops: 117 Total Existing/Repairs: 12

Ítems SOW
7 / 10 ítems
Paso a paso del alcance
Drops / qty SOW
88.5%
116 / 131
Horas labor
51.2%
41 / 80 hrs
Materiales
59.2%
6 / 12 líneas completas

1st Floor

Room 139 — new CAT6 data drops

Install three (3) new CAT6 data drops routed to IDF Room 143.

Pendiente
/ 3 drops

2nd Floor

Room 213A — new CAT6 data drops

Install twelve (12) new CAT6 data drops routed to IDF Room 205 (2 drops per box).

Hecho
/ 12 drops

2nd Floor

Room 213B — new CAT6 data drops

Install twelve (12) new CAT6 data drops routed to IDF Room 205 (2 drops per box).

Hecho
/ 12 drops

2nd Floor (Existing)

Room 212 — route existing data drops

Route four (4) existing data drops in Room 212.

Pendiente
/ 4 drops

2nd Floor (Repairs)

Room 211 — repair & troubleshoot floor drops

Repair and troubleshoot eight (8) existing data drops emerging from the floor.

Pendiente
/ 8 drops

3rd Floor

Room 301 — new CAT6 data drops

Install thirty (30) new CAT6 data drops routed to IDF Room 303.

Hecho
/ 30 drops

3rd Floor

Room 302 — new CAT6 data drops

Install thirty (30) new CAT6 data drops routed to IDF Room 303.

Hecho
/ 30 drops

3rd Floor

Room 308 — new CAT6 data drops

Install thirty (30) new CAT6 data drops routed to IDF Room 303.

Hecho
/ 30 drops

3rd Floor (Pathway)

4" EMT conduit pathway into IDF 303

Install one (1) 4-inch EMT conduit stick with a 4-inch 90-degree elbow transition for backbone entry into IDF Room 303.

Hecho
/ 1 ea

Infrastructure

Test, certify, label & document

Test, certify, label, and document all newly installed and repaired cabling.

Hecho
/ 1 lot

Cable Pulling & Floor Distribution

Horas planificadas en el bid: 42 hrs

En progreso
/ 42 hrs

Conduit & IDF Pathway Installation (4")

Horas planificadas en el bid: 6 hrs

Hecho
/ 6 hrs

Terminations (Jacks & Panels)

Horas planificadas en el bid: 12 hrs

Pendiente
/ 12 hrs

Existing Drops Repair & Wiremold Dress-in

Horas planificadas en el bid: 6 hrs

Pendiente
/ 6 hrs

Labeling (Point-to-Point)

Horas planificadas en el bid: 4 hrs

Pendiente
/ 4 hrs

Testing and Certification

Horas planificadas en el bid: 7 hrs

Pendiente
/ 7 hrs

Patch Panel Installation

Horas planificadas en el bid: 3 hrs

Pendiente
/ 3 hrs

Copper Cabling

CAT6 Plenum Cable

Bid: 18000 FT · Restante: 17900 · 0.6%

FT

Patch Panels

48-Port CAT6 Patch Panel

Bid: 3 Qty · Restante: 1 · 66.7%

Qty

Keystones & Jacks

CAT6 Keystone Jack

Bid: 117 Qty · Restante: 67 · 42.7%

Qty

Patch Cords

CAT6 Patch Cord 3 FT

Bid: 117 Qty · Restante: 117 · 0%

Qty

CAT6 Patch Cord 7 FT

Bid: 117 Qty · Restante: 117 · 0%

Qty

Consumables & Hardware

Velcro Strap (Rolls)

Bid: 4 Qty · Restante: 4 · 0%

Qty

Pathways & Supports

J-Hook 2"

Bid: 80 Qty · Restante: 0 · 100%

Qty

4" EMT Conduit

Bid: 10 FT · Restante: 0 · 100%

FT

4" EMT 90-Degree Elbow

Bid: 1 Qty · Restante: 0 · 100%

Qty

4" EMT Set-Screw / Compression Connectors

Bid: 2 Qty · Restante: 0 · 100%

Qty

4" EMT Set-Screw / Compression Couplings

Bid: 1 Qty · Restante: 0 · 100%

Qty

4" Plastic Bushings

Bid: 2 Qty · Restante: 0 · 100%

Qty

Historial

Últimos movimientos

  • status · project
    Estado → in_progress
  • update · material
    4" Plastic Bushings: usado 2
  • update · material
    4" EMT Set-Screw / Compression Couplings: usado 1
  • update · material
    4" EMT Set-Screw / Compression Connectors: usado 2
  • update · material
    J-Hook 2": usado 80
  • update · material
    CAT6 Keystone Jack: usado 50
  • update · material
    CAT6 Keystone Jack: usado 5
  • adjust · material
    48-Port CAT6 Patch Panel: +1
  • update · material
    48-Port CAT6 Patch Panel: usado 1
  • update · material
    4" EMT 90-Degree Elbow: usado 1
  • update · material
    4" EMT Conduit: usado 10
  • update · material
    CAT6 Plenum Cable: usado 100
  • update · material
    CAT6 Plenum Cable: usado 17000
  • update · labor
    Labor #1: 35/42 hrs
  • update · labor
    Labor #2: 6/6 hrs
  • complete · sow
    Room 213A — new CAT6 data drops
  • complete · sow
    Room 213B — new CAT6 data drops
  • update · sow
    SOW #6: 30/30 (done)
  • complete · sow
    Room 301 — new CAT6 data drops
  • update · sow
    SOW #7: 30/30 (done)
  • complete · sow
    Room 302 — new CAT6 data drops
  • update · sow
    SOW #8: 30/30 (done)
  • complete · sow
    Room 308 — new CAT6 data drops
  • update · sow
    SOW #9: 1/1 (done)
  • complete · sow
    4" EMT conduit pathway into IDF 303
  • update · sow
    SOW #10: 1/1 (done)
  • complete · sow
    Test, certify, label & document
  • update · sow
    SOW #1: 0/3 (pending)
  • update · sow
    SOW #1: 2/3 (in_progress)
  • seeded · project
    Proyecto Westland Hialeah cargado desde BID/SOW.